 The materials start here in the mill, where the mortise and tenon joinery posts and beams are shaped to become a home.
|

|

|
 At the site during the first pouring of the foundation, a marking in the mud.
|
 After laying the initial foundation, the radiant flooring system is established.
|
 The perimeter system which appears here redirects ground moisture away from the foundation.
|
 A vapor barrier, and insulation is placed over the entire foundation.
|
 With vapor barrier and insulation in place, the final network of tubing is placed which will aid the entire radiant flooring system to protect the house from moisture and cold.
|
 The foundation is then ready for the main slab to be poured.
|
 The foundation is then ready for the main slab to be poured.
|
 Frame Raising begins 8:05AM, October 26, 1998. Here the first wall is constructed, and support braces are put in place.
|
 One of the owners, Eric Flo, assists in the frame raising.
|

|
 The Purlin frame begins to take shape and reaches completion.
|
 To ensure the frame is completely level, plumb, and square, these "Come alongs" are used before the "Pegs" are inserted at the joints.
|

|
| |